Before beginning the installation, determine how many Vibes you will be installing. If you are
installing 2 units, the terminals can be mounted on opposite sides and therefore can be
mounted directly to the Spire. If you are installing units at 90 degrees to one another, the
terminals must be mounted using the swivel bracket. The swivel bracket and the hardware
to mount it are available in a separate kit from your distributor (KAV-109-002-XX).
The Spire should be located on a sturdy, level surface. The unit has leg levelers on the
bottom to make any necessary adjustments to keep the unit level and stable.
Mounting the Vibe Terminals
1.
Using the pilot holes in the Spire as a
guide, drill the four 1/4” holes needed
for direct mount or the six 1/4” holes
needed for mounting the swivel bracket.
Then, using the supplied Allen wrench,
install one of the supplied #10-24 screw
inserts into each hole. See Figure 1 for
pilot hole location.
2.
Swivel Bracket Mount only: Attach the
wall bracket to the Spire by installing
the 6 supplied pan head machine
screws (10 - 24 x 3/4) into the inserts,
as shown in Figure 1.
3.
Direct Mount only: Unlock the terminal
and push down on the lock release
while carefully opening the front of the
terminal. (Vibes with coin only: Re-
move the coin mech assembly from the
game by removing the three screws
securing the coin mech assembly and
pushing in the coin return. Refer to the
Vibe Owner’s manual for instruction.)
Attach the terminal to the Spire by in-
stalling the 4 supplied pan head ma-
chine screws (10 - 24 x 3/4) through
the terminal and into the inserts, as
shown in Figure 1. Continue with step
12.
4.
Using Figures 2A and 2B, determine
which swivel bracket you are install-
ing. The Vibe with bill bracket has the
smaller terminal bracket and the uni-
versal bracket has the long terminal
bracket. Follow the steps for the
swivel bracket you are installing.
5.
Universal wall bracket only: Attach the
terminal bracket to the wall bracket by
installing the machine screw
(1/4 - 20 x 1/2 L)
and 2 washers
(.75 T x 1/2 ID x 7/8 OD and
.83 T x 7/16 ID x 7/8 OD) up through the
hole in the wall bracket and then through
the tab in the terminal bracket as shown
in Figure 2B. The washer with the
larger inside diameter must be closest
to the bracket. Make sure that the
washers are centered and then loosely
tighten the screw. Install the hexnut to
secure the bracket, and then fully
tighten the screw and hexnut.
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
QTY PART
#
DESCRIPTION
1 SB0367-02
KIOSK
ASSEMBLY
28
HW 3031-02
#10 - 24 SCREW INSERTS
28
HW 4488
10 - 24 x .75 PAN HEAD SCREW S
1 HW 9888-01 ALLEN
W RENCH
1 HW 9350
CIRCULAR LEVEL
2
EC0072-04
5’ ETHERNET CABLE
1
CN4453-01
COUPLER, CROSSOVER, RJ45, 10BT
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
2 VIBE SPIRE INSTALLATION INSTRUCTIONS PM0404-02
6.
Vibe with bill wall bracket only: At-
tach the terminal bracket to the wall
bracket by installing the machine screw
(1/4 - 20 x 1/2 L)
and washers
(1/2 ID x 7/8 OD and 9/32 ID x 1 OD) up
through the hole in the wall bracket and
then through the tab in the terminal
bracket as shown in Figure 2A.
7.
Unlock the terminal and push down on
the lock release while carefully open-
ing the front of the terminal.
8.
Vibes with coin only: Remove the coin
mech assembly from the game by re-
moving the three screws securing the
coin mech assembly and pushing in the
coin return.
9.
Universal wall bracket only: Attach the
terminal to the terminal bracket using
the 4 supplied machine screws
(8 - 32 x 1/2 L) as shown in Figure 2B.
10. Vibe with bill wall bracket only: At-
tach the terminal to the terminal bracket
using the 3 supplied machine screws
as shown in Figure 2A. The single pan
head screw (10 - 32 x 1/2 L) should be
installed in the center hole, and the 2
flat screws (10 - 32 x 1/2 L) should be
installed in the outer holes.
11.
Secure the bottom of the terminal to the
bracket by installing the truss head
screw (3/8 - 16 x 3/4 L) and flat washer
(.083 T x 7/16 ID x 7/8 OD) through the
terminal and into the pivot on the wall
bracket as shown in Figure 2A for Vibe
with bill wall brackets and 2B for uni-
versal wall brackets.
12. Vibes with coin only: Replace the coin
mech assembly and secure it with the
three screws.
13. Close and lock the terminal.
14. Unlock and open the door on the Spire.
15. Reaching up through the door, push the
knock out plug from the inside of the
Spire to remove it from the unit. See
Figure 1.
16. Feed the wires from the terminal
through the hole in the Spire where the
knock out plug was removed and route
the wires down towards the bottom of
the Spire.
17. Repeat steps 1-16 for each terminal
you are installing.
18. Place the provided circular level in the
center of the Spire to ensure that the
unit is level. If any adjustments are
necessary to keep the unit level and
stable, loosen the nut on the leg lev-
eler, raise or lower the leg and then re-
tighten the nut.
19. Install the shelves in the Spire. The
larger shelf should be on the bottom
ledge and the middle shelf on the middle
ledge.
20. Continue with “Connecting the Termi-
nal and Processor.”
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
KNOCK OUT
PLUG LOCATION
WALL
BRACKET
PAN HEAD
MACHINE
SCREWS
(4 PLACES)
PILOT HOLES FOR
DIRECT MOUNT
(4 PLACES)
PILOT HOLES FOR
SWIVEL BRACKET MOUNT
(6 PLACES)
PAN HEAD
MACHINE
SCREWS
(6 PLACES)
LOCK FOR
SPIRE DOOR
(UNDER SHELF)
FIGURE 1 - VIBE SPIRE WITH SWIVEL BRACKET MOUNT AND DIRECT MOUNT
PM0404-02 VIBE SPIRE INSTALLATION INSTRUCTIONS 3
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
4 VIBE SPIRE INSTALLATION INSTRUCTIONS PM0404-02
PAN HEAD
MACHINE
SCREW
(6 PLACES)
TRUSS HEAD
SCREW
FLAT
WASHER
TERMINAL
BRACKET
WASHERS
MACHINE
SCREW
MACHINE
SCREW
(4 PLACES)
WALL
BRACKET
PIVOT
HEXNUT
WASHERS
MACHINE
SCREW
WALL
BRACKET
PIVOT
TRUSS HEAD
SCREW
FLAT
WASHER
FLAT
SCREW
(2 PLACES)
TERMINAL
BRACKET
PAN HEAD
MACHINE
SCREWS
(6 PLACES)
PAN HEAD
SCREW
FIGURE 2B - UNIVERSAL SWIVEL BRACKET MOUNT
FIGURE 2A - VIBE WITH BILL SWIVEL BRACKET MOUNT
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
PM0404-02 VIBE SPIRE INSTALLATION INSTRUCTIONS 5
Connecting the Terminal and
Processor
1.
Before connecting any cables, make
sure that the processor is turned off
and disconnected from any power
source.
2.
Unscrew the 2 thumbscrews on the
connector side of the processor and
remove the front cover plate. See Fig-
ure 3A for Vibes with bill and 3B for
Vibes with coin.
3.
Place the processor on one of the two
lower shelves inside the Spire. If you
are installing more than 2 units, the pro-
cessors can be stacked. If you are
connecting a MegaTunes unit, place it
directly on the shelf and stack any Vibe
processors on top of the MegaTunes.
4.
Route the 9-pin serial cable from the
terminal through the connector access
cutout on the processor and connect it
to the mating connector labeled
“touchscreen controller” in Figure 4.
5.
Route the 15-pin (high density DB, 3
rows of pins) VGA monitor signal cable
from the terminal through the connec-
tor access cutout on the processor and
connect it to the mating connector la-
beled “video” in Figure 4.
6.
Replace the front cover plate, routing
the cables through the cutouts on the
cover plate, and tighten the thumb-
screws to secure the cover plate.
7.
Connect the 15-pin (standard DB, 2
rows of pins) connector from the ter-
minal to the mating connector on the
outside of the processor and tighten
the screws on the connector to se-
cure it. See Figure 3A for Vibes with
bill and 3B for Vibes with coin. (This
cable is easily identified as it has
braided sleeving covering it.)
8.
Vibes with coin only: Connect the 9-
pin (standard DB, 2 rows of pins) con-
nector from the terminal to the mating
connector on the outside of the pro-
cessor and tighten the screws on the
connector to secure it. See Figure 3B.
(This cable is easily identified as it has
braided sleeving covering it.)
9.
Vibes with bill only: Connect the AC
power cord from the terminal to the
processor as shown in Figure 3A and
tighten the screws on the connector to
secure it.
10. Connect the AC power cord from the
terminal to the processor as shown in
Figures 3A and 3B and tighten the
screws on the connector to secure it.
11.
Route the AC power cord from the pro-
cessor (and MegaTunes units, if you
have installed them) through the hole in
the bottom of the Spire. Connect it to
an outlet and turn on the power. See
Figures 3A and 3B for power switch
location.
12. Repeat steps 1-11 for each Vibe you
have installed, then continue with “Link-
ing the Vibes”.
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
6 VIBE SPIRE INSTALLATION INSTRUCTIONS PM0404-02
VGA
VIDEO
TOUCHSCREEN
CONTROLLER
(COM 1)
I/O BOARD
ETHERNET
AUDIO OUT
CONNECTOR SIDE VIEW OF MOTHERBOARD
VIEW THROUGH
CONNECTOR
ACCESS
CUTOUT
ON PROCESSOR
FIGURE 4 - MOTHERBOARD CONNECTIONS AS SEEN THROUGH CUTOUT IN PROCESSOR
15-PIN CONNECTOR
FROM TERMINAL
THUMBSCREWS
SECURING FRONT
COVER PLATE
ON CONNECTOR
ACCESS CUTOUT
AC IN
AC OUT TO TERMINAL
ETHERNET
CONNECTOR
POWER SWITCH
FIGURE 3A - VIBE (WITH BILL) PROCESSOR - EXTERNAL CONNECTION LOCATIONS
AC IN
15-PIN CONNECTOR
FROM TERMINAL
THUMBSCREWS
SECURING FRONT
COVER PLATE
ON CONNECTOR
ACCESS CUTOUT
ETHERNET
CONNECTOR
9-PIN CONNECTOR
FROM TERMINAL
POWER SWITCH
FIGURE 3B -VIBE (WITH COIN) PROCESSOR - EXTERNAL CONNECTION LOCATIONS
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
Linking two games or linking one
game and a MegaTunes unit:
1.
Turn off and unplug the games.
2.
Connect one end of the supplied 5’
Ethernet cable to the Ethernet connec-
tor on the outside of the processor. See
Figure 3 for location. (If you are linking
a MegaTunes unit, the Ethernet ports
are located on the Ethernet hub
mounted to the single board computer
(SBC). The 4 ports on the right are all
for Ethernet, the port on the left is for
connecting a hub only. Loosen the 2
thumbnuts securing the front access
panel. Connect the Ethernet cable to
one of the Ethernet ports and route the
cable through the slots at the bottom of
the access panel.)
3.
Connect the second 5’ Ethernet cable
to the Ethernet connector on the out-
side of the second processor.
Linking The Vibes
PM0404-02 VIBE SPIRE INSTALLATION INSTRUCTIONS 7
FIGURE 5 - LINKING TWO GAMES
COUPLER
CROSSOVER
RJ45
5 FOOT
ETHERNET CABLE
VIBE
1
VIBE 2
OR
MEGATUNES
4.
Plug the free ends of both the 5’ Ethernet
cables into the coupler crossover. See
Figure 5.
5.
Plug in the games and turn on the power.
If installation was successful, you will
see a Mega-Link® button displayed on
the screen of the games after the menu
appears.
NOTE: The Mega-Link® icon will appear
on the game only when 2 or more games
are linked.
NOTE: If a MegaTunes unit has been linked
to a game, the music will be downloaded to
the game. This download time will vary de-
pending on the amount of music being down-
loaded.
6.
Close and lock the door on the Spire.
COPYRIGHT © 2003 MERIT INDUSTRIES, INC.
VIBE
4
HUB
5 FOOT
ETHERNET CABLE
10 BASE-T
HUB
MEGATUNES
VIBE
1
VIBE
2
VIBE
3
FIGURE 6 - LINKING MORE THAN TWO GAMES
8 VIBE SPIRE INSTALLATION INSTRUCTIONS PM0404-02
1.
Turn off and unplug the games.
2.
Connect one end of the supplied 5’
Ethernet cable to the Ethernet connec-
tor on the outside of the processor. See
Figure 3 for location. (If you are linking
a MegaTunes unit, the port for linking a
hub is located on the Ethernet hub
mounted to the single board computer
(SBC). The port on the left is for con-
necting a hub, the other 4 ports on the
right are all for Ethernet. Loosen the 2
thumbnuts securing the front access
panel. Connect the Ethernet cable to
the hub port and route the cable
through the slots at the bottom of the
access panel.) Repeat for all games
that you are linking.
3.
Plug the free ends of the Ethernet
cables into a 10 BASE-T Ethernet hub.
See Figure 6.
4.
Place the hub on top of the processors
inside the Spire. Tie wrap any excess
cabling.
5.
Plug in the games and turn on the power.
If installation was successful, you will
see a Mega-Link® button displayed on
the screen of the games after the menu
appears.
NOTE: The Mega-Link® icon will appear
on the game only when 2 or more games
are linked.
NOTE: If a MegaTunes unit has been linked
to a game, the music will be downloaded to
the game. This download time will vary de-
pending on the amount of music being down-
loaded.
6.
Close and lock the door on the Spire.
Linking more than two games:
NOTE: Linking more than two games requires the use of a 10 BASE-T Ethernet hub
(available from your distributor as a separate part (EC0030-01), or at your local computer
store).
One Ethernet cable is required for each game you are linking. Additional Cat-5 UTP RJ45
Ethernet cables can be purchased at your local computer store.
VIBE SPIRE INSTALLATION INSTRUCTIONS
PM0404-02
Converted from the original PDF for faster on-screen reading. Use Download PDF for the source document.